effective date of FCC action

Sometimes, even though you have FCC authority for your operations, you can still run into issues that can cause you to have that authority pulled out from under your operations. In three cases decided this week, the FCC’s Audio Division interpreted a number of its procedural rules – in two cases leading to the cancellation of FM translator licenses and the silencing of operating translator stations. In one case, the FCC decided that a licensed and operating FM translator had been licensed in error, as it actually created interference to an existing full-power FM station in a populated area, even though the translator application had initially claimed that it would not. In the second case, a translator was forced to cease operations because of interference from a new full-power station. When it did not resume operations within a one-year period, the FCC found that its license was automatically forfeited because of the year’s silence – even though the station had resumed operations in the construction period specified in a construction permit authorizing the translator to operate on a new frequency. These cases make clear how important the FCC’s procedural rules can be – actually leading to what are effectively life or death decisions for the license of a broadcast station.

In the first case, a translator licensee had a construction permit application granted to move to a new transmitter site. After the permit was granted, the licensee of a full-power station filed a Petition for Reconsideration of the grant, arguing that the translator would in fact create interference in populated areas served by its station. Despite the protest, the permittee constructed the translator at the new site, started operations and filed a license to cover the new construction – which was granted by the FCC. In reviewing the evidence filed by the petitioner, the FCC determined that there would in fact be interference caused to the full-power station in inhabited areas, contrary to what had been claimed in the translator’s CP application.  Based on that finding, the FCC revoked the license and underlying CP for the translator. The FCC made clear that a permittee who constructs a station when there is an objection to the underlying CP does so at its own risk. Where, as here, the underlying objection is found to have merit, the mere fact that the permittee had the right to build the station does not give him any grounds to argue that the station should be permitted to continue to operate – rejecting claims by the translator operator that, as there were no complaints of real interference caused by its operation, it should be permitted to continue to operate. Where the translator had prohibited contour overlap with the protected full-power station, and where it was shown that the area in which that overlap occurred was populated (shown by a USGS Topographic map that showed structures in the area), the operation was not permitted to continue.Continue Reading FCC Decisions Lead to Cancellation of Two FM Translator Licenses and Silencing of Operating Stations – Interference Issues and Time Limits on Being Off Air to Blame