For well over four years, television stations have not been able to file applications to upgrade their technical facilities as the FCC froze such applications as it wanted to preserve a stable database of TV facilities while it conducted the Incentive Auction and implemented the repacking of the TV band. For TV stations affected by the repacking, the FCC has opened two windows allowing repacked stations to change and maximize their technical facilities on their new channels, the second of which will end on November 2 (see our article here). It was generally expected that the next window to open would be one for the filing by LPTV and TV translator stations displaced by the repacking of full-power stations to find new channels on which they could operate. However, the FCC was approached by LPTV and translator advocates who worried that these stations would file their displacement applications, get construction permits and start to construct new facilities on new channels, only to again be displaced when the FCC lifted its freeze on the filing of applications for new facilities by full-power stations not affected by the repacking. They feared that the four years of pent up demand would cause a flood of applications by full-power stations, some of which might displace LPTVs and TV translators on their new displacement channels. To relieve some of that pent up demand by full-power and Class A stations not affected by the repacking, before the LPTV/translator displacement window, the FCC’s Media Bureau yesterday issued a Public Notice announcing that it will temporarily lift the freeze to allow applications by full-power and Class A TV stations that were not affected by the repacking.
The Public Notice does not specify the date for this lifting of the freeze. Instead, that date will be announced in another public notice specifying the limited period during which the freeze will be lifted. Applications filed after the lifting of the freeze will apparently be processed in the same way as normal minor change applications, on a first-come, first-serve basis. The lifting of the freeze will also allow the FCC to process construction permit applications filed by TV stations before the imposition of the freeze in April 2013 – applications that have been sitting at the FCC since that time.
Continue Reading FCC Announces That It Will Lift Filing Freeze on TV Station Modification Applications before LPTV/TV Translator Displacement Window
