Last week, we wrote about the FCC fining stations for a number of violations found at the studios of some broadcast stations.  In these same cases, the FCC also found a number of technical violations at the tower sites of some of the same stations.  Issues for which fines were issued included the failure to have an locked fence around an AM station’s tower, the failure of stations to be operating at the power for which they were authorized, and the failure to have a station’s Studio Transmitter Link operating on its licensed frequency.

An issue found in two case was the failure to operate at the power specified on the station’s license.  In one case, an AM station simply seemed to not be switching to its nighttime power – in other words, at sunset, it was not reducing power from the power authorized for its daytime operations.  The second case was one where another AM station was not switching to its nighttime antenna pattern after dark.  In that case, there were apparently issues with the nighttime antenna but, rather than request special temporary authority from the FCC to operate with reduced power until the problem was fixed, the FCC notes that the station apparently just kept operating with its daytime power.  An STA is not difficult to obtain when there is a technical issue (as the FCC does not want stations going dark if it can be avoided), and some effort is made to specify a power that avoids interference to other stations.  So, if faced with technical problems, request authority for operations that are different from those authorized by the station’s license until those problems can be fixed, or risk a fine from the Commission.Continue Reading FCC Inspections – Transmission Site Fines for Overpower Operation, Unlocked Tower Fences, and Improper STL Operations

Last week, the FCC issued several fines to broadcasters for failure to observe some basic FCC rules.  As there many FCC rules to observe, broadcasters should use the misfortune of others who have suffered from these fines as a way to check their own operations to make sure that they meet all of the required Commission standards.  In the recent cases, fines were issued for a variety of violations, including the failure to have a manned main studio, the failure to have a working EAS system, incomplete public files, operations of an AM station at night with daytime power, and the failure to have a locked fence around an AM tower.  This post deals with the issues discovered at the studios of stations – a separate post will deal with the issues at the transmitter sites. 

The main studio rule violation was a case that, while seemingly obvious, also should remind broadcasters of their obligations under the requirement that a station have a manned main studio.  In this case, when the FCC inspectors arrived at the station’s main studio, they found it locked and abandoned.  Once they were able to locate a station representative to let them into the studio, they found that there was some equipment in the facility, but it was not hooked up, nor was there any telephone or data line that would permit the station to be controlled from the site.  The Commission’s main studio rules require that there be at least two station employees for whom the studio is their principal place of business (I like to think of it as the place where these employees have their desks with the pictures of their kids or their dog, as the case may be, and where they show up in the morning to drink their morning cup of coffee before heading out to do sales, news or whatever their job may be).  At least one of the two employees who report to the studio as their principal place of business must be a management level employee, and at least one of those employees must be present during all normal business hours.  Thus, the studio should never be devoid of human life.  The studio must be able to originate programming, and the station must be able to be controlled from that location so that the employees there could originate programming in the event of a local emergency.  In light of these violations and others, the station in this case was fined $8000.Continue Reading FCC Inspections – Fines for Violations of Rules on Main Studio, EAS, and Public File

The threat from the recent fires to the tower farm on Mount Wilson from which many of the radio and television stations serving the Los Angeles area operate highlight the need for broadcasters to have an emergency plan in the event that some local catastrophe affects their tower site.  The fact that this fire comes near to the anniversary of Hurricane Katrina, where many broadcasters lost power, but where others where able to provide a lifeline to their communities, reminds broadcasters that emergencies can strike anywhere in the country, and broadcasters need to be ready.  The FCC’s Public Notice issued this week, adopting special procedures for stations in the area affected by the fire, demonstrate that the FCC is ready to work with broadcasters to provide service in the time of a widespread disaster, relaxing many of its normal rules.  The FCC has been very good in helping stations in the event of a mass disaster – even helping broadcasters during Katrina cut through the red tape of other agencies in order to assure their continued operation.  But broadcasters need to familiarize themselves with the rules about emergency operations, and be ready to deal with a more isolated disaster that may not receive enough attention for the FCC to, on its own, relax these rules.

One of the rules highlighted by the FCC’s public notice is Section 73.1250(f) of the Commission’s Rules, which allows an AM station to operate at night with its daytime power in the event of an emergency.  As many AMs operate only during daylight hours, and others routinely reduce power at night or use a directional antenna that restricts radiation in directions which may contain significant populations, this ability to continue to operate with daytime power and antenna pattern at night can allow a station to fully serve its community in times of emergency.  However, a broadcaster taking advantage of this provision needs to observe the requirements of the rule.  First, it must notify the FCC that it is operating under this rule within 48 hours of beginning to do so.  If the station causes irreparable interference to another station, it may be forced to curtail such operations. Moreover, the operation must be on a noncommercial basis (apparently to limit any financial incentive for a station to abuse this provision).  And finally, one issue not addressed in the FCC’s public notice about the Southern California fires, the use is only permitted if there is no other full-time service "serving the public need."  Obviously, that last clause is open to interpretation, but it would certainly seem to preclude an AM daytimer co-owned and simulcasting an FM station that covers the same are from suddenly operating at night.Continue Reading Operating Broadcast Stations in an Emergency – AM Operations at Night, STAs and Other Issues

An FCC decision released today reminds broadcasters of the need to notify the FCC of the completion of construction of a new broadcast auxiliary stationStudio Transmitter Links (STL) and Remote Pickups (RPU) have for several years been licensed through the FCC’s Wireless Bureau, rather than through the Media Bureau.  Unlike a grant of authority

Following the digital transition, issues with the reception of some television stations have highlighted the need for the use of outdoor antennas to receive the digital signal.  Last week, in three FCC decisions, the Commission made clear that its Over-the-Air Reception Device rules (the "OTARD rules") prohibit most zoning and other land-use restrictions, both governmental and private, on the use of such antennas.  These rules were adopted as a result of Congressional actions, and prohibit many restrictions on the installation and use of antennas used to receive television and other video signals either on private property owned by the user of the antenna or on property leased by the user.  Stations should become familiar with these rules, and let their viewers know of the rules, so that they can use them if they have problems installing antennas to receive the new digital signals over the air.

The rules apply to antennas that are one meter or less in diameter, or any size in Alaska, and are designed to receive or transmit direct broadcast satellite services, or one meter or less in diagonal measurement and are designed to receive or transmit video programming services through multipoint distribution services, including multichannel multipoint distribution services, instructional television fixed services, and local multipoint distribution services; and antennas designed to receive television broadcast signals.  For the Rule to apply, the antenna must be installed on property within the exclusive use or control of the antenna user where the user has a direct or indirect ownership or leasehold interest in the property upon which the antenna is located. Continue Reading FCC’s OTARD Rules – Limiting Zoning and Land Use Restrictions on Outdoor TV Antennas

A recent FCC decision shows how important it is for an applicant for a construction permit for a new or modified broadcast station, which entails the construction of a new tower, to take all steps set out on the the environmental worksheets associated with FCC Form 301 before certifying that the tower will not create environmental issues.  In the recent case, the FCC did not find that any actual environmental issues existed with the applicant’s proposed construction of a new tower, but it nevertheless stated that it would have fined the applicant for a false certification if the statute of limitations for the fine had not passed.  Why?  Simply because the applicant had not touched all of the required bases before making its certification that the tower construction posed no threat to the environment.  The applicant had tried to argue that no environmental study was necessary as the site was a de facto tower farm given that there were already two towers nearby, but that claim was rejected by the FCC, finding that nearby towers do not necessarily constitute a tower farm.

The tower farm issue was interesting in that the applicant pointed to the fact that there were two existing towers within a couple hundred feet of his proposed tower, and thus the existence of these towers, plus the word that he received from local authorities that the site was a good one at which to build a site due to the lack of any perceived impacts, was not sufficient either to make the site a "tower farm" exempt from further environmental processing, nor was it sufficient to demonstrate that there was no need for further environmental study.  The FCC’s staff did a thorough review of the cases about what constitutes a tower farm and, while noting that there was no clear definition in the rules, found that the two nearby towers, as they were substantially shorter than the one proposed by the applicant, were not of the same "character" as that proposed by the applicant, and thus the site was not a tower farm.  Apparently, to some degree, the FCC adopted a "we’ll know it when we see it" approach to the definition of a tower farm, and concluded that they did not see it here.Continue Reading When are a Bunch of Towers Really a Tower Farm – Only the FCC Knows for Sure

In these challenging economic times, it seems like almost every day we see a notice that a broadcast station has gone silent while the owner evaluates what to do with the facility.  This seems particularly common among AM stations – many of which have significant operating costs and, in recent times, often minimal revenues.  The DTV transition deadline (whenever that may be) may also result in a number of TV stations that don’t finish their DTV buildout in time being forced to go dark.  While these times may call for these economic measures to cut costs to preserve the operations of other stations that are bringing in revenue, broadcasters must remember that there are specific steps that must be taken at the FCC to avoid fines or other problems down the road.

One of the first issues to be addressed is the requirement that the FCC be informed of the fact that a station has gone silent.  Once a station has ceased operations for 10 days, a notice must be filed with the the FCC providing notification that the station is not operational.  If the station remains silent for 30 days, specific permission, in the form of a request for Special Temporary Authority to remain silent, must be sought from the FCC.  The rules refer to reasons beyond the control of the licensee as providing justification for the station being off the air.   Traditionally, the FCC has wanted a licensee to demonstrate that there has been a technical issue that has kept the station off the air.  The Commission was reluctant to accept financial concerns as providing justification for the station being silent – especially if there was no clear plan to sell the station or to promptly return it to the air.  Perhaps the current economic climate may cause the FCC to be more understanding – at least for some period of time.Continue Reading Steps to Take When A Broadcast Station Goes Silent

The FCC last week issued an order fining a broadcast  tower owner $2000 for failure to monitor the lights on its tower.  The FCC requires that a tower owner either monitor the tower by visual inspection or by a properly installed automatic monitoring system, at least once every 24 hours.  In this case, the tower owner

In a recent decision, the FCC adopted new rules for AM station proofs of performance that make the process much simpler.  We wrote about this proposal when it was advanced, here.  The order adopted a week ago allows stations installing new series fed AM directional antennas to avoid the time-consuming and expensive process of

In a Consent Decree released this week, the Commission agreed to accept a "voluntary contribution" of $16,500 to the government from a tower owner, instead of a fine, for its failure to conduct an Historical Review of the locations of three towers prior to their construction.  Under the Nationwide Programmatic Agreement which implements the National Historic Preservation